Completed Projects 2000-2006

 

 

PROJECT: Upgrade Intrusion Detection System

LOCATION: Air National Guard Base, South Portland, Maine

TYPE: Upgrade existing systems

OWNER: Air National Guard

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $18,184

START DATE OF PROJECT: September 2006

SCHEDULE OF COMPLETION: December 2006

PERCENT WORK WITH OWN FORCES: 10%

PROJECT MANAGER: Stacey Morrison

SUPERINTENDENT: Stacey Morrison

CONTACT: MSgt Patrick Nott, 207-990-7419

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

PROJECT: Building 417 Vestibule

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: New storefront system

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $17,111

START DATE OF PROJECT: September 2006

SCHEDULE OF COMPLETION: January 2007

PERCENT WORK WITH OWN FORCES: 10%

PROJECT MANAGER: Stacey Morrison

SUPERINTENDENT: Steve Dumais

CONTACT: MSgt Patrick Nott, 207-990-7419

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

PROJECT: Penobscot Valley Hospital Lobby Renovation

LOCATION: Lincoln, Maine

TYPE: Interior Renovations

OWNER: Penobscot Valley Hospital

ARCHITECT: SMRT, Lynne Holler

CONTRACT AMOUNT: $295,020

START DATE OF PROJECT: September 2006

SCHEDULE OF COMPLETION: December 2006

PERCENT WORK WITH OWN FORCES: 20%

PROJECT MANAGER: Fred Gay

SUPERINTENDENT: Bruce Clement

CONTACT: Paul Smith, 207-794-3321

PROJECT DELIVERY METHOD: Bid, General Contractor

PROJECT: New Mobile Office Setup and Installation

LOCATION: Hodgdon, Maine

TYPE: Sitework for mobile office along with utilities and wiring

OWNER: U.S. General Services Administration

ARCHITECT: GSA

CONTRACT AMOUNT: $85,010

START DATE OF PROJECT: September 2006

SCHEDULE OF COMPLETION: October 2006

PERCENT WORK WITH OWN FORCES: 15%

PROJECT MANAGER: Emelie Ferland

SUPERINTENDENT: Emelie Ferland

CONTACT: Laurence Albright, 207-532-7852

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

PROJECT: Roof Replacement Building #488

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: Replace Existing Roof Building #488

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $27,840

START DATE OF PROJECT: June 2006

SCHEDULE OF COMPLETION: August 2006

PERCENT WORK WITH OWN FORCES: 15%

PROJECT MANAGER: Stacey Morrison

SUPERINTENDENT: Steve Dumais

CONTACT: MSgt Patrick Nott, 207-990-7419

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

PROJECT: Tank Repairs/Inspections

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: Tank Repair & Inspect/Test Leak & Protection Systems

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $62,289

START DATE OF PROJECT: May 2006

SCHEDULE OF COMPLETION: August 2006

PERCENT WORK WITH OWN FORCES: 5%

PROJECT MANAGER: Emelie Ferland

SUPERINTENDENT: Steve Dumais

CONTACT: MSgt Treena Nadeau 207-990-7353

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

PROJECT: Demolition / Repair of Building # 515

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: Demolition / Repair Existing Building

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $387,697

START DATE OF PROJECT: April 2006

SCHEDULE OF COMPLETION: October 2006

PERCENT WORK WITH OWN FORCES: 15%

PROJECT MANAGER: Michael Lemieux

SUPERINTENDENT: Steve Dumais

CONTACT: SMSgt Neils Neilson, 207-990-7016

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

PROJECT: Upgrade Building #510 Fire Alarm Systems

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: Upgrade Fire Alarm Systems

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $62,030

START DATE OF PROJECT: June 2006

SCHEDULE OF COMPLETION: July 2006

PERCENT WORK WITH OWN FORCES: 15%

PROJECT MANAGER: Stacey Morrison

SUPERINTENDENT: Steve Dumais

CONTACT: Darlene Howes 207-626-4550

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

PROJECT: EMCC – Maine Hall Renovations

LOCATION: Bangor, Maine

TYPE: Renovations to Existing Building

OWNER: Eastern Maine Community College

ARCHITECT: WBRC Architects-Engineers, Inc.

CONTRACT AMOUNT: $1,529,572

PERCENT COMPLETE: 99% -Spring Work

START DATE OF PROJECT: June, 2005

SCHEDULE OF COMPLETION: November 2006

PERCENT WORK WITH OWN FORCES: 20%

PROJECT MANAGER: Michael Lemieux

SUPERINTENDENT: Lou Turmelle

CONTACT: Dan Belyea, Director of Facilities Management

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: Aubert Hall – Room 231 Renovations

LOCATION: Orono, Maine

TYPE: Renovations to Aubert Hall

OWNER: University of Maine System

ARCHITECT: Symmes, Maini & McKee Associates

CONTRACT AMOUNT: $1,052,740

PERCENT COMPLETE: 95%- Change Order and Spring Work

START DATE OF PROJECT: June 2005

SCHEDULE OF COMPLETION: December 2005

PERCENT WORK WITH OWN FORCES: 99%

PROJECT MANAGER: Michael Lemieux

SUPERINTENDENT: Tony Savage

CONTACT: Fred Stoddard, Building Construction Engineer

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: DFD Russell Medical Center

LOCATION: Leeds, Maine

TYPE: Addition / Renovations to Medical Offices

OWNER: DFD Russell Medical Center

ARCHITECT: Harriman Associates

CONTRACT AMOUNT: $566,185

PERCENT COMPLETE: 99% -Spring Work

START DATE OF PROJECT: April 2005

SCHEDULE OF COMPLETION: December 2005

PERCENT WORK WITH OWN FORCES: 99% -Spring Work

PROJECT MANAGER: Richard Leeman

SUPERINTENDENT: Will Ryder

CONTACT: Laurie Kane, CEO

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  Corundel Commons

LOCATION:   Corinna, Maine

TYPE:  New Senior Housing Facility

OWNER:  Corundel Commons Senior Housing Associates LP

ARCHITECT:  Salmon Falls Architecture

CONTRACT AMOUNT:   $1,639,105

PERCENT COMPLETE:  95%

START DATE OF PROJECT:  February 2005

SCHEDULE OF COMPLETION:  April 2006

PERCENT WORK WITH OWN FORCES:  98%

PROJECT MANAGER:  Richard Leeman

SUPERINTENDENT:  Kirk Wood

CONTACT:   Joe Ponzetti

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: Topsham Rental Center

LOCATION: Topsham, Maine

TYPE: Pre-Engineered Steel Building

OWNER: Terrance Gray

ARCHITECT: N/A

CONTRACT AMOUNT: $503,350

PERCENT COMPLETE: 99%

START DATE OF PROJECT: September, 2005

SCHEDULE OF COMPLETION: February, 2006

PERCENT WORK WITH OWN FORCES: 53%

PROJECT MANAGER: Larry Rancourt

SUPERINTENDENT: Jim Savage

CONTACT: Terrance Gray

PROJECT DELIVERY METHOD: Negotiated

 

PROJECT: DDC Controls

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: Mechanical systems upgrade

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $233,007.00

PERCENT COMPLETE: 98%

START DATE OF PROJECT: August 2005

SCHEDULE OF COMPLETION: October 2005

PERCENT WORK WITH OWN FORCES: 11%

PROJECT MANAGER & SUPERINTENDENT: Emelie Ferland

CONTACT: Robert Busch 207-990-7419

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

PROJECT: USM Childcare Facility

LOCATION: Gorham, Maine

TYPE: Construction of New Facility

OWNER: University of Maine System

ARCHITECT: TFH Architects Chris Briley 207-775-6141

CONTRACT AMOUNT: $1,617,372

PERCENT COMPLETE: 95%

START DATE OF PROJECT: November 2005

SCHEDULE OF COMPLETION: June 2006

PERCENT WORK WITH OWN FORCES: 40%

PROJECT MANAGER: Mike Lemieux

SUPERINTENDENT: Tony Savage

CONTACT: Dana Gray 207-780-5646

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: UMA Student Center Roof Improvements

LOCATION: Augusta, Maine

TYPE: Roof and Entrance Improvements

OWNER: University of Maine System

ARCHITECT: WBRC

CONTRACT AMOUNT: $237,764

PERCENT COMPLETE: 95%

START DATE OF PROJECT: November, 2005

SCHEDULE OF COMPLETION: February, 2006

PERCENT WORK WITH OWN FORCES: 40%

PROJECT MANAGER: Richard Leeman

SUPERINTENDENT: Richard Beaulieu

CONTACT: Peter St. Michael

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: DEP Ray Building

LOCATION: Augusta, Maine

TYPE: Renovation of Main Lobby and Bathrooms Floors 1-3

OWNER: Bureau of General Services, State of Maine

ARCHITECT: Cubellis Associates

CONTRACT AMOUNT: $328,486

PERCENT COMPLETE: 24%

START DATE OF PROJECT: January, 2006

SCHEDULE OF COMPLETION: April, 2006

PERCENT WORK WITH OWN FORCES: 60%

PROJECT MANAGER: Mike Lemieux

SUPERINTENDENT: Bruce Clement

CONTACT: Julie Tupper

PROJECT DELIVERY METHOD: Bid, General Contractor

PROJECT: Bangor City Hall Renovations

LOCATION: Bangor, Maine

TYPE: Basement Renovations

OWNER: City of Bangor

ARCHITECT: Carpenter Associates

CONTRACT AMOUNT: $167,500

PERCENT COMPLETE: 30%

START DATE OF PROJECT: February, 2006

SCHEDULE OF COMPLETION: April, 2006

PERCENT WORK WITH OWN FORCES: 30%

PROJECT MANAGER: Richard Leeman

SUPERINTENDENT: Steve Dumais

CONTACT: Jeff Landwehr

PROJECT DELIVERY METHOD: Bid, General Contractor

PROJECT: Canopy over Truck Inspection Platform

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: Pre-engineered canopy

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $54,111.00

START DATE OF PROJECT: October 2005

SCHEDULE OF COMPLETION: November 2005

PERCENT WORK WITH OWN FORCES: 78%

PROJECT MANAGER: Emelie Ferland

SUPERINTENDENT: Dick Beaulieu

CONTACT: Sgt. Dirck Storms 207-990-7434

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

PROJECT: Maine Veteran’s Home Addition/Downeast Community Hospital

LOCATION: Machias, Maine

OWNER: Maine Veteran’s Home

ARCHITECT: SMRT

CONTRACT AMOUNT: $9,752,808

PERCENT COMPLETE: 99%

START DATE OF PROJECT: May 2004

DATE OF COMPLETION: January 2006

PERCENT WORK WITH OWN FORCES: 99% -Spring Work

PROJECT MANAGER: Larry Rancourt

SUPERINTENDENT: Fred Gay

CONTACT: Ron Herbert, MVH 207-763-6300

PROJECT DELIVERY METHOD: Bid, General Contractor

PROJECT: Repairs to Curbs, Walkways, Stairs & Dead End Water Mains

LOCATION: Air National Guard Base, Bangor, Maine

TYPE: Site work

OWNER: Air National Guard, Bangor

ARCHITECT: Maine Air National Guard

CONTRACT AMOUNT: $90,368.82

START DATE OF PROJECT: September 2005

SCHEDULE OF COMPLETION: November 2005

PERCENT WORK WITH OWN FORCES: 45%

PROJECT MANAGER: Larry Rancourt

SUPERINTENDENT: Dick Beaulieu

CONTACT: Mrs. Darlene R. Howes 207-626-4559

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

PROJECT: New Portland Glass Facility

LOCATION: Brunswick, Maine

TYPE: Construction of Retail Facility

OWNER: The Dwyer Group, Inc.

ARCHITECT: James Herrick

CONTRACT AMOUNT: $1,150,000

START DATE OF PROJECT: May 2005

SCHEDULE OF COMPLETION: October 2005

PERCENT WORK WITH OWN FORCES: 15%

PROJECT MANAGER: Richard Leeman

SUPERINTENDENT: Charlie O’Brien

CONTACT: Mike Bidwell

PROJECT DELIVERY METHOD: Negotiated

 

PROJECT: Blue Hill Wreaths

LOCATION: Blue Hill, Maine

TYPE: Pre-Engineered Steel Building

OWNER: Terrance Gray

ARCHITECT: N/A

CONTRACT AMOUNT: $130,854

START DATE OF PROJECT: July, 2005

SCHEDULE OF COMPLETION: September, 2005

PERCENT WORK WITH OWN FORCES: 100%

PROJECT MANAGER: Larry Rancourt

SUPERINTENDENT: Jim Savage

CONTACT: Terrance Gray

PROJECT DELIVERY METHOD: Negotiated

 

PROJECT: Library Expansion Project

LOCATION: Lewiston, Maine

TYPE: Phase III Renovations

OWNER: City of Lewiston

ARCHITECT: Schwartz/Silver Architects, Inc.

CONTRACT AMOUNT: $2,830,123

START DATE OF PROJECT: March 2004

SCHEDULE OF COMPLETION: September 2005

PERCENT WORK WITH OWN FORCES: 20%

PROJECT MANAGER: Michael Lemieux

SUPERINTENDENT: Richard Beaulieu

CONTACT: Available upon request

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: Bucksport Regional Health Center

LOCATION: Bucksport, Maine

TYPE: Renovations of entrance and nurse’s station

OWNER: Bucksport Regional Health Center

ARCHITECT: Ames Engineers

CONTRACT AMOUNT: $190,777

START DATE OF PROJECT: October 2004

SCHEDULE OF COMPLETION: February 2005

PERCENT WORK WITH OWN FORCES: 30%

PROJECT MANAGER: Michael Lemieux

SUPERINTENDENT: Will Ryder

CONTACT: Jack Corrigan

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: Fairground Apartments

LOCATION: Orrington, Maine

TYPE: Renovation to Apartment Complex

OWNER: Orrington Housing Corp.

ARCHITECT: Carpenter Associates

CONTRACT AMOUNT: $155,179

START DATE OF PROJECT: February 2005

SCHEDULE OF COMPLETION: June 2005

PERCENT WORK WITH OWN FORCES: 63%

PROJECT MANAGER: Donald McGilvery

SUPERINTENDENT: Jim Savage

CONTACT: Susanne Shaw

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  Dr. Bossong & Dr. Rice Dental Offices

LOCATION:   Brunswick, Maine

TYPE:  New Medical Office Building

OWNER:   Dr. Lawrence Bossong and Dr. Thomas Rice

ARCHITECT:  Bethanis & Hayford

CONTRACT AMOUNT:  $1,128,511

PERCENT COMPLETE:  100%

START DATE OF PROJECT:  July, 2004         

SCHEDULE OF COMPLETION: February, 2005

PERCENT WORK WITH OWN FORCES:  30%

SUPERINTENDENT: Richard Beaulieu

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Bid, General Contractor

PROJECT:  Reny’s Surgical Offices

LOCATION:   Damariscotta, Maine

TYPE:  Renovation of former Reny’s Warehouse

OWNER:  Renbro Inc.

ARCHITECT:  George Parker

CONTRACT AMOUNT:   $144,790

PERCENT COMPLETE:  5%

START DATE OF PROJECT:  September 2004

SCHEDULE OF COMPLETION: February 2005

PERCENT WORK WITH OWN FORCES:  50%

SUPERINTENDENT:  Kirk Wood

CONTACT:   John or Bob Reny 207-563-3177, George Parker 207-563-8754

PROJECT DELIVERY METHOD: Negotiated General Contract

 

PROJECT:  Damariscotta Municipal Offices

LOCATION:   Damariscotta, Maine

TYPE:  Renovation of former School Building

OWNER:  Town of Damariscotta

ARCHITECT:  Pine Tree Engineering

CONTRACT AMOUNT:   $589,000

START DATE OF PROJECT:  June 2004

SCHEDULE OF COMPLETION:  December 2004

PERCENT WORK WITH OWN FORCES:  40%

SUPERINTENDENT:  Kirk Wood

CONTACT:   William S. Post, Administrator 207-563-5168

PROJECT DELIVERY METHOD: Bid, General Contractor

PROJECT:  Reny’s Therapist Offices

LOCATION:   Damariscotta, Maine

TYPE:  Renovation of former Reny’s Warehouse

OWNER:  Renbro Inc.

ARCHITECT:  George Parker

CONTRACT AMOUNT:   $122,064

START DATE OF PROJECT:  October 2004

SCHEDULE OF COMPLETION:  December 2004

PERCENT WORK WITH OWN FORCES:  50%

SUPERINTENDENT:  Kirk Wood

CONTACT:   John or Bob Reny 207-563-3177, George Parker 207-563-8754

PROJECT DELIVERY METHOD: Negotiated General Contract

 

PROJECT:  Senator Inn Restaurant Renovations

LOCATION:   Augusta, Maine

TYPE:  Interior Renovations

OWNER:   Vern & Betsy Cook

ARCHITECT:  None

CONTRACT AMOUNT:  $150,000

START DATE OF PROJECT:  August, 2004    

SCHEDULE OF COMPLETION: November, 2004

PERCENT WORK WITH OWN FORCES:  40%

SUPERINTENDENT: Will Ryder

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Design/Builder, Negotiated Contract

 

PROJECT:  Lambs Book & Bible Store

LOCATION:   Bangor, Maine

TYPE:  Renovations of former restaurant to retail space

OWNER:   Royce Cross

ARCHITECT:  Philip Dougherty, Renaissance Design

CONTRACT AMOUNT:  $125,000

START DATE OF PROJECT:  September, 2004    

SCHEDULE OF COMPLETION: November, 2004

PERCENT WORK WITH OWN FORCES:  30%

SUPERINTENDENT: Don McGilvery

CONTACT:  Alice Dyer

PROJECT DELIVERY METHOD: Negotiated, General Contractor

 

PROJECT:  Precast Concrete Products of Maine Plant Expansion

TYPE:  Pre-engineered Building addition

OWNER:   Terrance Gray, President, PCM

ARCHITECT:  None

CONTRACT AMOUNT:  $250,000

START DATE OF PROJECT:  July, 2004         

SCHEDULE OF COMPLETION: November, 2004

PERCENT WORK WITH OWN FORCES:  90%

SUPERINTENDENT: Jim Savage

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Design/Builder, Negotiated Contract

 

PROJECT:  Clark’s Garage

LOCATION:   Gardiner, Maine

TYPE:  Installation of Metal Building

OWNER:  Bob Clarke

ARCHITECT:  N/A

CONTRACT AMOUNT:   $31,283

START DATE OF PROJECT:  October 2004

SCHEDULE OF COMPLETION: November 2004

PERCENT WORK WITH OWN FORCES:  100%

SUPERINTENDENT:  Jim Savage

CONTACT:   Available upon request

PROJECT DELIVERY METHOD: Negotiated General Contract

PROJECT:  Comfort Inn Renovations III

LOCATION:   Augusta, Maine

TYPE:  Renovations of Guest Rooms

OWNER:   Augusta Civic LLC DBA

ARCHITECT:  N/A

CONTRACT AMOUNT:  $22,339

START DATE OF PROJECT:  September, 2004    

SCHEDULE OF COMPLETION: October, 2004

PERCENT WORK WITH OWN FORCES:  40%

SUPERINTENDENT: Stacey Morrison

CONTACT:  Linette Searcy (207) 623-1000

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  Capitol Shopping Center

LOCATION:   Augusta, Maine

TYPE:  Interior tenant fit-up

OWNER: WP Realty

ARCHITECT: Bunker & Savage

CONTRACT AMOUNT:  $321,133

START DATE OF PROJECT:  March 2004    

DATE OF COMPLETION: August 2004

PERCENT WORK WITH OWN FORCES:  50%

SUPERINTENDENT: Tony Savage

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Bid, General Contractor

PROJECT:  Reny’s Podiatrist Offices

LOCATION:   Damariscotta, Maine

TYPE:  Renovation of former Reny’s Warehouse

OWNER:  Renbro Inc.

ARCHITECT:  George Parker

CONTRACT AMOUNT:   $154,791

START DATE OF PROJECT:  June 2004

SCHEDULE OF COMPLETION: August 2004

PERCENT WORK WITH OWN FORCES:  50%

SUPERINTENDENT:  Kirk Wood

CONTACT:   John or Bob Reny 207-563-3177,

                       George Parker 207-563-8754

PROJECT DELIVERY METHOD: Negotiated General Contract

PROJECT:  Coastal Foot and Ankle

LOCATION:   Falmouth, Maine

TYPE:  Interior tenant fit-up

OWNER:   Dr. Meredith

ARCHITECT:  Gawron Turgeon Architects

CONTRACT AMOUNT:  $147,000

PERCENT COMPLETE:  90%

START DATE OF PROJECT:  January 2004    

SCHEDULE OF COMPLETION: April 2004

PERCENT WORK WITH OWN FORCES:  20%

SUPERINTENDENT: Richard Beaulieu

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  Dr. Bufo Tenant Fit-up

LOCATION:   U. S. Route 1, Scarborough, Maine

TYPE:  Interior tenant fit-up

OWNER:   Dr. Bufo

ARCHITECT:  Studio MNEMOSYNE

CONTRACT AMOUNT:  $190,000.00

START DATE OF PROJECT: January 2004    

DATE OF COMPLETION:  April 2004

PERCENT WORK WITH OWN FORCES:  30%

SUPERINTENDENT: Richard Beaulieu

CONTACT:  Dr. Michael Bufo

PROJECT DELIVERY METHOD: Design/Build

 

PROJECT:  KeyBank Cash Vault

LOCATION:   Gorham, Maine

TYPE:  Renovate warehouse to

OWNER:   KeyBank

ARCHITECT:  VWCGS Architects

CONTRACT AMOUNT:  $370,129

START DATE OF PROJECT:  January 2004    

SCHEDULE OF COMPLETION: March 2004

PERCENT WORK WITH OWN FORCES:  35%

SUPERINTENDENT: Fred Gay

CONTACT:  Patrick Hedderman, Property Manager (518) 257-8686

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  Chad Little Outdoor Power Equipment

LOCATION:   Brunswick, Maine

TYPE:  Addition to existing equipment service sales and service building

OWNER:   Bruce Weeks

ARCHITECT:  Kirby Building Systems

CONTRACT AMOUNT:  $220,476

START DATE OF PROJECT:  November 2003

SCHEDULE OF COMPLETION: Feb 2004

PERCENT WORK WITH OWN FORCES:  60%

SUPERINTENDENT: Jimmy Savage

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Design/Build

 

PROJECT:  Hope Elementary School

LOCATION:   Hope, Maine

TYPE:  New addition and renovation of existing

OWNER:   Maine School Union 69

ARCHITECT:  Woodard & Curran Inc.

CONTRACT AMOUNT:  $1,512,339.00

START DATE OF PROJECT:  June 2003        

SCHEDULE OF COMPLETION: Feb 2004

PERCENT WORK WITH OWN FORCES:  25%

SUPERINTENDENT: Fred Gay

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  Senator Inn Spa Expansion

LOCATION:   Western Avenue, Augusta, Maine

TYPE:  Design/Build Services for a Three-story addition to existing Spa facility.

OWNER:   Vern & Betsey Cook

ARCHITECT:  Fuller Nichols Architects

CONTRACT AMOUNT:  Estimated: $900,000.00

START DATE OF PROJECT:  December 2002

SCHEDULE OF COMPLETION:  February 2004

PERCENT WORK WITH OWN FORCES:  25%

SUPERINTENDENT:  Ken Smith

CONTACT:  Vern Cook  207-622-8800

PROJECT DELIVERY METHOD: Design/Build

 

PROJECT:  DDC Controls

LOCATION: Air National Guard Base, Bangor, Maine

TYPE:  Mechanical systems upgrade.

OWNER:  Air National Guard, Bangor

ARCHITECT:  Maine Air National Guard

CONTRACT AMOUNT:  $182,482.00

START DATE OF PROJECT:  October 2002

SCHEDULE OF COMPLETION:  January 2004

PERCENT WORK WITH OWN FORCES:  10%

SUPERINTENDENT:  Stacey Morrison

CONTACT:   SGT Robert Busch   207-990-7419

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

PROJECT:  Reny’s Doctors’ Offices

LOCATION:   Damariscotta, Maine

TYPE:  Renovation of former Reny’s Warehouse

OWNER:  Renbro Inc.

ARCHITECT:  George Parker

CONTRACT AMOUNT:   $280,729

START DATE OF PROJECT:  November 2003

SCHEDULE OF COMPLETION: April 2004

PERCENT WORK WITH OWN FORCES:  50%

SUPERINTENDENT:  Kirk Wood

CONTACT:   John or Bob Reny 207-563-3177

                       George Parker 207-563-8754

PROJECT DELIVERY METHOD: Negotiated General Contract

 

PROJECT: Wright Pierce Roof Improvements

LOCATION: Topsham, Maine

TYPE: Addition of a new, pitched roof over existing building

ARCHITECT: Wright Pierce Engineers

CONTRACT AMOUNT: $107,200

START DATE OF PROJECT: October 2003

SCHEDULE OF COMPLETION: January 2004

PERCENT WORK WITH OWN FORCES: 10%

SUPERINTENDENT: Jim Savage

CONTACT: Daniel Pratt, Wright Pierce Engineers 207-865-6332

PROJECT DELIVERY METHOD: Bid, General Contractor

 

LOCATION: Air National Guard Base, Bangor, Maine

TYPE:  Fueling Area Improvements: 3 Metal Buildings and an Inspection Platform

OWNER:  Air National Guard, Bangor

ARCHITECT:  Maine Air National Guard

CONTRACT AMOUNT:  $168,049

START DATE OF PROJECT:  October 2003

SCHEDULE OF COMPLETION:  January 2004

PERCENT WORK WITH OWN FORCES:  70%

SUPERINTENDENT:  Richard Beaulieu

CONTACT:   SGT Robert Busch   207-990-7419

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

 

LOCATION: Air National Guard Base, South Portland, Maine

TYPE:  Mechanical systems upgrade, Building P-9

OWNER:  Air National Guard, Bangor

ARCHITECT:  Maine Air National Guard

CONTRACT AMOUNT:  $74,715

START DATE OF PROJECT:  November 2002

SCHEDULE OF COMPLETION:  January 2004

PERCENT WORK WITH OWN FORCES:  2%

SUPERINTENDENT:  Stacey Morrison

CONTACT: Darlene Rae Howes, Contract Specialist 207-626-4559

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

LOCATION: Air National Guard Base, South Portland, Maine

TYPE:  Roofing replacement, Building 8.

OWNER:  Air National Guard, Bangor

ARCHITECT:  Maine Air National Guard

CONTRACT AMOUNT:  $60,160

START DATE OF PROJECT:  November 2003

SCHEDULE OF COMPLETION:  January 2004

PERCENT WORK WITH OWN FORCES:  14%

SUPERINTENDENT:  Stacey Morrison

CONTACT: Darlene Rae Howes, Contract Specialist 207-626-4559

PROJECT DELIVERY METHOD: Task Order Bid, General Contractor

 

 

PROJECT:  Tri Sports

LOCATION:   Topsham, Maine

TYPE:  New storage building addition

OWNER:   Tri Sports

ARCHITECT:  Kirby Building Systems

CONTRACT AMOUNT:  $109,299

START DATE OF PROJECT:  September 2003   

SCHEDULE OF COMPLETION: November 2003

PERCENT WORK WITH OWN FORCES:  75%

SUPERINTENDENT: Jim Savage

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Design/Build

 

PROJECT:  Madison Medical Care Development

LOCATION:   Madison, Maine

TYPE:  New construction

OWNER: Madison Medical Care Development

ARCHITECT:  Lassell Architects

CONTRACT AMOUNT:  440,202

START DATE OF PROJECT:  July 2003        

SCHEDULE OF COMPLETION: December 2003

PERCENT WORK WITH OWN FORCES:  50%

SUPERINTENDENT: Tony Savage

CONTACT:  Margaret Copelin

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  USDA Lab

LOCATION:   Orono, Maine

TYPE:  New construction

OWNER:   USDA

ARCHITECT:  Delta Engineering, PA

CONTRACT AMOUNT:  $223,486

START DATE OF PROJECT: July 2003        

SCHEDULE OF COMPLETION: December 2003

PERCENT WORK WITH OWN FORCES:  50 %

SUPERINTENDENT: Richard Beaulieu

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT:  Stillwater Commercial Building

LOCATION:   Bangor, Maine

TYPE:  New construction

OWNER:   Stillwater, LLC

ARCHITECT:  N/A

CONTRACT AMOUNT:  $392,197.00

START DATE OF PROJECT:  May 2003       

SCHEDULE OF COMPLETION: November 2003

PERCENT WORK WITH OWN FORCES:  41%

SUPERINTENDENT: Richard Beaulieu

CONTACT:  Available upon request

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: Holiday Inn Room Renovations, Phase II

LOCATION: Augusta, Maine

TYPE: Interior finishes upgrades

OWNER: Augusta Community LLC

ARCHITECT: N/A

CONTRACT AMOUNT: $27,025.00

START DATE OF PROJECT: September2003

DATE OF COMPLETION: October 2003

PERCENT WORK WITH OWN FORCES: 44%

SUPERINTENDENT: Stacey Morrison

CONTACT: Linette Searcy 207 622-4751

PROJECT DELIVERY METHOD: Construction Management

 

PROJECT: Border Station Re-roofing

LOCATION: Houlton, Maine

TYPE: Re-roofing of existing.

OWNER: General Services Administration

ARCHITECT: N/A

CONTRACT AMOUNT: $58,390.00

START DATE OF PROJECT: 2003

DATE OF COMPLETION: 2003

PERCENT WORK WITH OWN FORCES: 22%

SUPERINTENDENT: Stacey Morrison

CONTACT: Larry Albright 207-532-7852

PROJECT DELIVERY METHOD: Bid, General Contractor

 

PROJECT: Monmouth Library

LOCATION: Monmouth, Maine

TYPE: Renovations to